To protect public health in the neighborhoods surrounding the Linden East site during its chromium cleanup, PPG implemented a dust-control program.
Airborne concentrations of hexavalent chromium during the cleanup were less than the limit permitted by the New Jersey Department of Environmental Protection.
That’s according to the final air-monitoring report on the effectiveness of the dust-suppression plan, which is based on the results from air monitors that operated on the fence line of the site.
Among the exposure-prevention measures were:
-
Water misting work areas to suppress dust;
-
Restricting open-air soil stockpiles;
-
Spraying surfaces with dust-suppression materials;
-
Limiting truck traffic to paved areas on-site;
-
Pressure-washing trucks in protected areas before exiting sites; and
-
Covering open excavations when not being worked.
For more details about dust suppression and air quality at the Linden East site during its cleanup, contact the Site Administrator.
Email:
Telephone:
Mailing Address:
Site Administrator
Chromium Cleanup Partnership
One Hovchild Plaza
4000 Route 66
4th Floor (MDMC)
Tinton Falls, N.J. 07753